|
Total Count of Projects: 797
Address:
91 River St Toronto, ON M5A 3P4
Approximately occupancy date:2025
Building size:
34
Builder:
Broccolini
Project Description:
LeftBank Condos is a new condo development by Broccolini currently in preconstruction at 91 River Street, Toronto. The development is scheduled for completion in 2025. LeftBank Condos has a total of 385 units.
Address:
8 Elm St Toronto, ON M5G 1G7
Approximately occupancy date:
Building size:
68
Builder:
Reserve Properties and Capital Developments
Project Description:
8 Elm is a new condo development by Reserve Properties and Capital Developments currently in preconstruction at 8 Elm Street, Toronto. 8 Elm has a total of 807 units.
Address:
1478 St Clair Ave West Toronto, ON
Approximately occupancy date:2025
Building size:
9
Builder:
Format Group
Project Description:
Earlscourt Condo is a new condo development by Format Group currently in preconstruction at 1478 Saint Clair Avenue West, Toronto. Earlscourt Condo has a total of 55 units.
Address:
1102 Horseshoe Valley Rd West Barrie, ON L4M 4Y8
Approximately occupancy date:2025
Building size:
7
Builder:
Freed Developments
Project Description:
Horseshoe Residences is a new condo development by Freed Developments currently in preconstruction at 1102 Horseshoe Valley Road West, Barrie. The development is scheduled for completion in 2025. Horseshoe Residences has a total of 183 units. Sizes range from 356 to 773 square feet.
Address:
36 Zorra St Etobicoke, ON M8Z 4Z7
Approximately occupancy date:June 2023
Building size:
36
Builder:
Altree Developments and EllisDon Capital
Project Description:
Thirty Six Zorra Condominiums is a new condo development by Altree Developments and EllisDon Capital currently under construction at 36 Zorra Street, Toronto. Thirty Six Zorra Condominiums has a total of 459 units.
Address:
41 Wilson St Hamilton, ON L8R 1C6
Approximately occupancy date:2027
Building size:
31
Builder:
Emblem Developments
Project Description:
The Design District is a new condo development by Emblem Developments currently in preconstruction at 41 Wilson Street, Hamilton. The development is scheduled for completion in 2027. The Design District has a total of 931 units.
Address:
190 Enterprise Blvd Markham, ON L6G 1B3
Approximately occupancy date:
Building size:
38
Builder:
Remington Homes
Project Description:
Gallery Towers is a new condo development by Remington Homes currently in preconstruction at 190 Enterprise Boulevard, Markham. Gallery Towers has a total of 552 units.
Address:
464 Springbank Dr London, ON N6J 1G8
Approximately occupancy date:2025
Building size:
9
Builder:
AvranceCorp Development
Project Description:
Springbank Lux is a new condo development by AvranceCorp Development currently in preconstruction at 464 Springbank Drive, London. Springbank Lux has a total of 186 units.
Address:
310 Erb St West Waterloo, ON N2L 1W3
Approximately occupancy date:2024
Building size:
6
Builder:
Urban Legend Developments
Project Description:
Introducing Moda Condos, a stunning new development coming soon to Waterloo! Featuring a highly desirable location near Erb St W & University Ave W, residents at Moda will find themselves surrounded with a number of sought after amenities
Address:
109 Erskine Ave Toronto, ON M4P 1Y5
Approximately occupancy date:
Building size:
22
Builder:
Curated Properties
Project Description:
AKRA Living is a new condo and townhouse development by Curated Properties currently in preconstruction at 109 Erskine Avenue, Toronto. AKRA Living has a total of 211 units.
Address:
266 King St West Toronto, ON M5V 1H8
Approximately occupancy date:2028
Building size:
84
Builder:
Great Gulf Homes and Westdale Properties and Dream
Project Description:
Forma is a new condo development by Great Gulf , Westdale Properties and Dream currently in preconstruction at 266 King Street West, Toronto. Forma has a total of 2034 units.
Address:
89 Niagara St Toronto, ON M5V 1C3
Approximately occupancy date:
Building size:
14
Builder:
Aspen Ridge Homes
Project Description:
The Essery is a new condo development by Aspen Ridge Homes currently in preconstruction at 109 Niagara Street, Toronto.
Address:
70 Mississauga Rd South Mississauga, ON L5H 2H3
Approximately occupancy date:
Building size:
Builder:
Diamondcorp and Dream and Fram + Slokker and Kilmer Group
Project Description:
Bridge House at Brightwater is a new condo development by Diamondcorp , Dream , Fram + Slokker and Kilmer Group currently in preconstruction at 70 Mississauga Road South, Mississauga.
Address:
206 King St West Hamilton, ON L8P 1A5
Approximately occupancy date:
Building size:
14
Builder:
Canlight Realty Corp.
Project Description:
Radio Arts is a new condo development by Canlight Realty Corp. currently in preconstruction at 206 King Street West, Hamilton. Radio Arts has a total of 122 units. Sizes range from 363 to 1020 square feet.
Address:
3194 Dundas St W, Toronto, ON M6P 2A3
Approximately occupancy date:
Building size:
8
Builder:
Gairloch Ltd.
Project Description:
Craft Residences is a new condo development by Gairloch currently in preconstruction at 3194 Dundas Street West, Toronto. Craft Residences has a total of 86 units.
Address:
The Gore Rd & Queen St East Brampton, ON
Approximately occupancy date:
Building size:
35
Builder:
Poetry Living and HBNG Holborn Group and TACC Developments
Project Description:
CityPointe Heights is a new condo development by Poetry Living , HBNG Holborn Group and TACC Developments currently in preconstruction at The Gore Road & Queen Street East, Brampton. CityPointe Heights has a total of 658 units.
Address:
490 St Clair Ave West Toronto, ON
Approximately occupancy date:2025
Building size:
33
Builder:
Canderel Residential and KingSett Capital
Project Description:
Forêt is a new condo development by Canderel Residential and Kingsett Capital currently in preconstruction at 490 Saint Clair Avenue West, Toronto. The development is scheduled for completion in 2025. Forêt has a total of 1000 units.
Address:
1625 Military Trail Scarborough, ON M1C 1B3
Approximately occupancy date:2025
Building size:
8
Builder:
Altree Developments
Project Description:
Highland Commons is a new condo development by Altree Developments currently in preconstruction at 1625 Military Trail, Toronto. Highland Commons has a total of 550 units.
Address:
151 City Centre Dr Mississauga, ON L5B 1M7
Approximately occupancy date:June 2024
Building size:
31
Builder:
Camrost-Felcorp
Project Description:
Exchange Signature Residences is a new condo development by Camrost Felcorp currently in preconstruction at 151 City Centre Drive, Mississauga. The development is scheduled for completion in 2024. Exchange Signature Residences has a total of 250 units. Sizes range from 555 to 888 square feet.
Address:
3320 Hwy 7 Vaughan, ON
Approximately occupancy date:2027
Building size:
56
Builder:
SmartLiving
Project Description:
Park Place is a new condo development by SmartLiving currently in preconstruction at Commerce Street & Highway 7, Vaughan. The development is scheduled for completion in 2027. Park Place has a total of 1111 units. Sizes range from 477 to 905 square feet.
|
|
The data contained on these pages is provided purely for reference purposes. Due care has been exercised to ensure that the statements contained here are fully accurate, but no liability exists for the misuse of any data, information, facts, figures, or any other elements; as well as for any errors, omissions, deficiencies, defects, or typos in the content of all pre-sale and pre-construction projects content. All floor plans dimensions, specifications and drawings are approximate and actual square footage may vary from the stated floor plan. The operators of these web pages do not directly represent the builders. E&OE.
|
|
|
|
|